The Denmark Environment Centre’s original building was destroyed by fire in 2008.
M&A Steel Fabrication was engaged to fabricate and install the structural steel required for the new centre.
Situated on a restricted lot with dramatic changes of level, the site created a number of construction challenges which were so successfully overcome the project was awarded for Excellence in Construction on a Challenging Lot at the 2015 Master Builders Awards (Great Southern).